TENANT IMPROVEMENT HVAC

Tenant improvement HVAC contractor for commercial build-outs

We carry the mechanical scope on tenant improvement work — load calculations, equipment, ductwork, ventilation, controls and balancing — sequenced so the equipment arrives on time, the ceiling closes on schedule and the space is comfortable on move-in day.
Home  /  Tenant Improvement HVAC Contractor
WHAT WE OWN ON A TI

The HVAC scope on a tenant improvement, start to finish

A tenant improvement is a remodel inside a building that is already running, and that changes what the HVAC work actually is. You are reworking air distribution under a roof or on a floor someone else designed, often tying into rooftop units, a central plant or a building automation system the landlord controls.

We take that scope end to end: checking what the existing equipment can actually deliver, running the load calculation for the new layout, releasing any new equipment, installing ductwork, diffusers and controls, coordinating the ceiling with electrical, plumbing and sprinklers, and carrying the permit, testing and balancing through to final sign-off.

The work we do before any duct is hung is what keeps the job on schedule. Occupant density, ventilation rates, equipment heat loads and zoning all get confirmed against the drawings first, because any one of them can change the equipment — and the equipment is almost always the longest lead item on the job.

What comes with the contract

SCOPE OF WORK

What a TI HVAC contractor is responsible for

Six blocks of work that show up on nearly every commercial tenant improvement, whether the space is office, retail, medical or food service.

Loads and equipment

A load calculation for the new layout, then confirming whether the existing units can carry it or new equipment is needed. This is settled before anything else is priced.

Ductwork and air distribution

Supply, return and exhaust ductwork, VAV boxes, diffusers and grilles laid out to the reflected ceiling plan so every room gets the air it was designed for.

Ventilation and exhaust

Outside air set to the occupancy, restroom and specialty exhaust, and the code-required ventilation rates documented for plan review.

Controls

Thermostats, zone controls and integration with the building automation system, programmed to the tenant’s schedule rather than left on factory defaults.

Testing and balancing

Measuring and adjusting airflow at every diffuser and box so the system delivers what was designed, with a balance report for the owner.

Permits and inspections

Mechanical plan submittal, response to review comments, and the inspection sequence from rough-in through final — tied to the occupancy date.

HOW THE JOB RUNS

The order the work goes in

HVAC starts with capacity and equipment and finishes with balancing. Both ends are hold points, so the sequence is planned before the first crew arrives.
01

Walk the space and verify the equipment

We check the existing units, their age and condition, the duct mains, the controls and what the building provides. What the drawings assume and what is actually installed are compared before a number is given.
02

Run the loads and price line by line

The load calculation tells us whether the existing equipment works. Equipment, ductwork, controls, ventilation and balancing are then priced separately, with allowances marked.
03

Permit and long leads in parallel

Drawings go in for plan review while rooftop units, split systems and specialty fans are released, so the permit clock and the lead times run together.
04

Rough-in and ceiling coordination

Ductwork, boxes and piping go in overhead, coordinated with sprinklers, lighting and plumbing, and inspected before the ceiling closes.
05

Set equipment and start up

New units are set, often with a crane and a weekend roof closure, connected and started up by the manufacturer’s procedure.
06

Balance, commission and final

Airflow is balanced, controls are checked, the energy code commissioning is completed where required, and the final mechanical inspection is signed off.
COMMON QUESTIONS

Tenant improvement HVAC questions

If your question is not here, call and ask for an estimator.

Both. On smaller suites we often contract with the tenant or landlord directly. On larger build-outs we usually work as the mechanical subcontractor under a general contractor, with a written scope letter and submittals on the specification’s schedule.

Often, if they have the capacity for the new layout and enough service life left. We check both before pricing, because replacing a unit that is near the end of its life during the build-out is usually cheaper than doing it later.

Rooftop units and larger split systems are frequently built to order, and lead times move with the market. That is why we release equipment off preliminary drawings once the loads are confirmed.

It is measuring the airflow at each diffuser and box and adjusting dampers and fan speeds until the system delivers what was designed. Without it, some rooms run too hot or too cold no matter what the thermostat says.

Yes. Commercial energy codes set requirements for equipment efficiency, economizers, controls and, in many jurisdictions, commissioning. We design or verify the system against the code your jurisdiction has adopted.

Get the tenant improvement HVAC priced

Send the drawings or a scope summary and your target date. We turn most estimates around in three business days.