Commercial rooftop unit replacement

Rooftop units condition most low-rise commercial space in the country, and a build-out is often the right moment to replace them. We size the new units, plan the crane lift and swap them with as little downtime as possible.
Home  /  Commercial Rooftop Unit Replacement
REPLACE OR REUSE

Replacing rooftop units without disrupting the building

A rooftop unit is the single biggest piece of HVAC equipment on most tenant improvements. Replacing one involves the roof, a crane, the structure, the electrical service and the controls, and usually has to happen on a scheduled day with the landlord’s approval.

The first question is whether replacement is needed. We check the age, condition and capacity of the existing units against the new layout. Sometimes a unit that looks old still has years left and enough capacity; sometimes a newer one is simply the wrong size for what the tenant is doing.

When replacement makes sense, a like-for-like swap is rarely exactly that. New units have different footprints, weights and electrical requirements, so curb adapters, structural checks and electrical changes are all part of the plan.

What a replacement involves

SCOPE OF WORK

What we deliver on a rooftop unit replacement

The pieces of an RTU replacement, from assessment to start-up.

Assessment

Age, condition, refrigerant type and capacity of each existing unit, with a clear recommendation to keep or replace.

Sizing

A load calculation so new units are sized to the space as it will be used, not copied from the old nameplate.

Curbs and roof

Curb adapters or new curbs, flashing coordinated with the roofer so the roof warranty is protected.

Crane lift

Lift planning, permits for street or parking closures, and scheduling with the landlord and neighboring tenants.

Electrical and controls

Coordination with the electrician on feeds and disconnects, and new thermostats or building automation integration.

Start-up

Manufacturer start-up, economizer and controls checks, and a balance of the supply air after replacement.

HOW THE JOB RUNS

The replacement sequence

The steps that keep a replacement to a single planned day on the roof.
01

Assess and size

We confirm what needs replacing and size the new units for the actual use of the space.
02

Release equipment and plan the lift

Units are ordered and the crane lift is scheduled with the landlord, roofer and any required permits.
03

Prepare the roof

Curb adapters, electrical changes and control wiring are prepared ahead so the lift day is as short as possible.
04

Lift, connect and start up

Old units come off, new units go on, and they are connected, started up and balanced.
COMMON QUESTIONS

Rooftop unit questions

If your question is not here, call and ask for an estimator.

We look at age, condition, refrigerant type, repair history and whether its capacity fits the new layout. We give you a clear recommendation with the reasons.

Sometimes directly, more often with a curb adapter. New units rarely match old footprints exactly, and the adapter avoids cutting a new roof opening.

The area served by that unit will, usually for a day. We schedule replacements for mild weather and off-hours where possible.

Often. New equipment may have different electrical requirements, so we coordinate feeds, breakers and disconnects with the electrician.

We coordinate with the building’s roofing contractor so curbs and flashing are done in a way that protects the roof warranty.

Find out if your units should be replaced

Send the building address and the unit information you have. We will assess them and tell you where you stand.