Commercial HVAC subcontractor for general contractors

Most of our work is under a general contractor. We give you a scope letter you can level against other bids, submittals on the specification’s turnaround, a foreman who works the ceiling out with the other trades and closeout documents before the final pay application.
Home  /  Commercial HVAC Subcontractor
WHAT GCS NEED FROM A SUB

A mechanical sub that does not become the critical path

A general contractor does not need a mechanical contractor who is merely competent. They need one whose bid is complete, whose equipment arrives when promised, who hangs duct without blocking the other trades and who turns in the balance report and closeout documents without being chased.

Our bids are written to be leveled. Every inclusion and exclusion is spelled out — equipment, crane, roofing, controls, test and balance, commissioning, electrical connections — so you are comparing the same scope across bidders and not discovering a gap after award.

On site, our foreman attends coordination meetings and works the ceiling out with the sprinkler, electrical and plumbing trades before anyone hangs anything. Ductwork is the largest item in most ceilings, so getting it coordinated first keeps everyone else moving.

What you get with our bid

HOW WE WORK WITH YOU

What we handle as your HVAC sub

The administrative side of the job matters as much as the installation.

Leveled bids

Scope letters written line by line so the GC can level them against other mechanical bids without guessing what was left out.

Submittals

Equipment data, duct shop drawings and controls submittals, on schedule and resubmitted promptly when comments come back.

Ceiling coordination

Duct routing worked out with sprinkler, electrical and plumbing before installation, so conflicts are solved on paper.

Schedule and inspections

A look-ahead that tracks equipment delivery, crane days and inspections, with requests made on time.

Safety and compliance

Roof safety, crane lift plans, and the insurance certificates and documentation general contractors require.

Closeout

Balance report, as-builts, warranties, start-up reports and O&M manuals delivered with the final inspection.

HOW THE JOB RUNS

From bid to closeout

The milestones a general contractor can hold us to.
01

Bid with a clear scope letter

We walk the site and roof when possible and return a scope letter that states what is in, what is out and what is an allowance.
02

Buy out and release equipment

Once awarded, equipment submittals go first so units can be released as soon as they are approved.
03

Coordinate and install

Our foreman coordinates the ceiling with the other trades, and duct rough-in follows the framing without holding it up.
04

Balance, inspect and close out

The system is started up, balanced and inspected, and the closeout package goes in with the final.
COMMON QUESTIONS

Questions from general contractors

If your question is not here, call and ask for an estimator.

We can bid from plans, but on tenant improvements a walk of the suite and the roof catches existing conditions that change the price. If a walk is possible, we take it.

We call them out in the scope letter. Electrical connections to equipment, controls wiring, roofing at curbs and condensate drains are commonly split between trades, so we state exactly which side of each line we are on.

Yes, either with our own technicians or a certified independent balancer when the specification requires one.

Confirmed loads and an approved equipment submittal. We ask for approval on equipment first because it has the longest lead time.

Balance report, as-built drawings, start-up reports, warranties, operation and maintenance manuals and any required commissioning documentation.

Send us the bid package

Share the drawings, specifications and bid date. We confirm our scope and return a leveled number on your schedule.