SHELL AND CORE

Building the HVAC system from the shell up

First-generation space is a blank page with rules. The landlord has provided roof curbs or a connection to a central system, a set of building standards for equipment, controls and ceiling work, and sometimes an allowance of cooling capacity per square foot. Everything inside the demising walls is ours to design, price and install.

That freedom is useful, but every decision is new. Where units sit on the roof, how the zones are drawn, how ductwork reaches each room and how controls tie into the building all need to be settled early, because they shape the ceiling and the schedule.

We start by reading the landlord’s tenant criteria alongside the tenant’s layout and occupancy. The two often disagree about capacity or roof space, and it is far cheaper to resolve that in writing before equipment is ordered than on the roof.

What we need to start

SCOPE OF WORK

What a shell build-out includes

From the roof to the last diffuser, this is the HVAC work on a typical first-generation build-out.

Equipment

Rooftop units, split systems or connections to the building’s central system, sized to the load calculation and the landlord’s standards.

Ductwork

Supply and return mains, branches, VAV or zone boxes and diffusers, laid out to the floor plan and coordinated in the ceiling.

Ventilation and exhaust

Outside air to the occupancy, restroom and specialty exhaust, and any dedicated exhaust the use requires.

Controls

Thermostats or a full controls package, integrated with the building automation system where the landlord requires it.

Condensate and piping

Condensate drainage, refrigerant piping for split systems and any hydronic connections to a central plant.

Start-up and balancing

Manufacturer start-up, test and balance, and the commissioning the energy code requires before turnover.

HOW THE JOB RUNS

The shell build-out sequence

The order the work goes in, from the first drawing to a comfortable space.
01

Confirm capacity and roof space

We check the landlord’s criteria, curb locations and structural limits against the tenant’s loads before design is finished.
02

Design and release equipment

Once the loads are fixed, units are released so their lead time runs while the permit is in review.
03

Rough-in overhead

Ductwork, boxes and piping go in with the framing, coordinated with sprinklers, lighting and plumbing.
04

Set units

Rooftop equipment is set by crane, usually on a scheduled weekend with the roof and parking area closed off.
05

Start up and control

Units are connected, started up and tied into the controls, and temporary heating or cooling is retired.
06

Balance and turn over

The system is balanced, commissioned where required and handed over with closeout documents.
COMMON QUESTIONS

Shell build-out HVAC questions

If your question is not here, call and ask for an estimator.

It is space delivered with no interior finishes, no distribution and often no equipment — usually just roof curbs or a connection point to the building system. Everything inside the suite is part of the build-out.

We find that out before design is final. The options are usually additional or larger units with the landlord’s approval, supplemental systems for high-load rooms, or reducing the load. Each has a cost and a schedule.

We can. On many build-outs we work design-build, producing permit drawings stamped by a licensed engineer where the jurisdiction requires it. On others we price and build from the engineer’s drawings.

Usually. Crane lifts are scheduled in advance, often on weekends, with the landlord’s approval and any required street or parking closures.

Server and IT rooms usually need their own cooling that runs around the clock, separate from the office system. We size and place it with the IT team.